Ranger Mine

Construction

About Ranger Mine

This project focused on the remediation of a decommissioned uranium mine within Kakadu National Park, a site of significant environmental and cultural importance. The project required a highly specialised approach to safely manage the stabilisation and rehabilitation of the former mine site while adhering to stringent environmental and regulatory requirements.

A key aspect of the project was the design, engineering, and construction of 36 modular barges, which were assembled to form a 75-meter-long work platform. This custom-built floating platform was fully engineered for structural integrity and stability, ensuring it could safely support two 120-tonne wicking rigs operating simultaneously. The use of this modular barge system enabled efficient access to the tailings area, which would have otherwise been inaccessible by conventional means.

The Stage 1 works involved the installation of approximately 41,000 wick drains to accelerate the consolidation of the mine tailings. These wick drains played a crucial role in expediting the natural settlement process, allowing for safer and more effective long-term rehabilitation of the site. The large-scale wick drain installation required precision execution to ensure proper placement and effectiveness in stabilising the tailings.

Due to the project’s remote location and strict environmental guidelines, operations were carefully planned and executed with multiple work fronts operating simultaneously. To meet the demanding schedule, teams worked in 12-hour shifts, with the project running 24 hours a day, ensuring continuous progress and efficiency.

This project showcased innovative engineering solutions, meticulous environmental management, and efficient execution, contributing to the long-term restoration and sustainability of the former uranium mine site within Kakadu National Park

Project Summary

Client – Ventia
Project Value – $15,000,000.00
Completion Date – May 2023

Key Achievements

Accurate installation of over 41,000 wick drains in a uniformly spaced grid configuration whilst maintaining positional accuracy within +/- 500mm at over 700 designated Barge locations
Delivery of 36 x modular barge system, on time and on budget to remote territory mine site.

TESTIMONIALS

HEAR FROM SOME
OF OUR FRIENDS

GET IN CONTACT

If you need to tow it, show it, build it, push it, deliver it, lift it or salvage it over water; please complete this form and one of our team will be in touch.

Gate 2, James Craig Rd, Rozelle NSW 2039

locaphone

Phone: +61 2 9563 8333
Emergency Phone: +61 (0) 418 231 916