Manly Boat Shed – Pontoon & Jetty Replacement

Construction

About Manly Boat Shed – Pontoon & Jetty Replacement

This project involved the construction of a new pontoon, gangway, and timber jetty, integrating both land and marine consulting design to ensure a durable and functional structure. The scope included the pre-assembly and installation of a 22m x 3.5m ISP pontoon, as well as the design and fabrication of a 7m aluminium gangway for safe and efficient access.

Structural works comprised timber and steel piling with HDPE sleeves for enhanced durability and environmental protection. The project also involved the demolition of existing structures, followed by inspections, surveys, and the installation of electrical and service connections to support operational requirements.

This project delivered a high-quality marine access solution, combining precision engineering, robust materials, and expert installation to meet both functional and environmental standards.

Project Summary

Client – Manly Boat Shed
Project Value – $1,000,000.00
Completion Date – January 2023

Key Achievements

We received positive feedback from the client, who expressed their appreciation for our work and conveyed their satisfaction with our services This was noted by an increased scope of works to be delivered.
Stabilisation of the waterfront side of the Boat Shed to allow for future expansion. This was achieved through the installation of steel piles into rock sockets without disturbing the surrounding area.

TESTIMONIALS

HEAR FROM SOME
OF OUR FRIENDS

GET IN CONTACT

If you need to tow it, show it, build it, push it, deliver it, lift it or salvage it over water; please complete this form and one of our team will be in touch.

Gate 2, James Craig Rd, Rozelle NSW 2039

locaphone

Phone: +61 2 9563 8333
Emergency Phone: +61 (0) 418 231 916