This project involved the early works demolition of Blackwattle Bay Wharf, a complex operation that required the removal of over 500 piles, including 400 timber piles and 100 concrete piles. The extraction process was influenced by the site-specific conditions and existing geotechnical challenges, necessitating the development of two specialised extraction methods to ensure the safe and efficient removal of the piles from the seabed.

Given the complexity of the site, one of the proposed methods for pile removal involved the application of a 50-ton vertical line pull. This method utilised a 50-tonne hydraulic A-frame to generate the necessary force to vibrate the piles out of the seabed, ensuring controlled and safe removal of each pile. This technique was particularly effective for extracting piles that were firmly embedded in the ground.

The second method, known as the cookie cutter method, involved the fabrication of specialised cookie cutter piles designed to be used for vibrating existing piles. These custom-designed piles were placed around the base of the existing piles to destroy soil cohesion, reducing the friction between the pile and surrounding soil. This process allowed for easier vibratory extraction, which significantly enhanced the efficiency of removing piles that had become difficult to extract using traditional methods.

Both methods were chosen after careful consideration of the geotechnical conditions and site-specific challenges, ensuring that the demolition process was conducted safely and with minimal disruption to the surrounding environment. The use of these innovative extraction techniques enabled the team to complete the pile removal efficiently, setting the stage for further phases of the demolition and redevelopment of Blackwattle Bay Wharf.

Project Summary

Client – Liberty Industrial
Project Value – $1,700,000.00
Completion Date – April 2020

Key Achievements

Two proposed methodology to ensure completion of the works and the ability to adapt as the situation changed onsite.
Removal of a large number of structures without damaging remaining structures.

TESTIMONIALS

HEAR FROM SOME
OF OUR FRIENDS

GET IN CONTACT

If you need to tow it, show it, build it, push it, deliver it, lift it or salvage it over water; please complete this form and one of our team will be in touch.

Gate 2, James Craig Rd, Rozelle NSW 2039

locaphone

Phone: +61 2 9563 8333
Emergency Phone: +61 (0) 418 231 916